This rear view will be changing.
Monday, March 8, 2010
Outer walls up today.
Here we are two weeks into the adventure. Excavation, foundation, floor joists, sub-floor and today the exterior wall studs. Bill and I were laughing today, when he asked how far we'd be if we were doing this project. Honestly, I think we'd still be arguing about how much to excavate, haha. Tomorrow will be interior wall studs. Weds the trusses will be delivered. Amazing.

Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2010
(37)
- ► 07/04 - 07/11 (1)
- ► 05/23 - 05/30 (2)
- ► 05/16 - 05/23 (2)
- ► 05/09 - 05/16 (3)
- ► 05/02 - 05/09 (1)
- ► 04/25 - 05/02 (3)
- ► 04/18 - 04/25 (2)
- ► 04/11 - 04/18 (1)
- ► 04/04 - 04/11 (1)
- ► 03/28 - 04/04 (1)
- ► 03/21 - 03/28 (2)
- ► 03/14 - 03/21 (4)
- ▼ 03/07 - 03/14 (6)
- ► 02/28 - 03/07 (4)
- ► 02/21 - 02/28 (4)
No comments:
Post a Comment