Roy the plumber did the final hook ups today. Everything works and I'm ready to go in and fire up the jetted tub. Final touches will be the tile around the tub and the trim tile around the floor. Need a shower door, but a temp shower curtain is up so Bill will be able to try it out. Love the new vanity, which has a full width bottom drawer. Need to install closet shelves, but it's at least usable. Hope to have the final inspection tomorrow and start moving in to the new digs. Can't wait.